How Long Does a Roof Replacement Take From Start to Finish?

So, the time has finally come when you have decided to replace your roof. At Discounted Roofing LLC, we understand that roof replacements are big projects – demanding a significant amount of time & money. From our own experience as top roofing contractors in Philadelphia, we also know how stressful it can be.

Many homeowners have asked us about the duration of their roof replacement project. After all, tearing off your old roof and installing a new one can seem like an overwhelming plot. But fret not – we are here to take the stress away.

We will break down the various factors that go into roof replacements so you can plan ahead for a smooth & stress-free experience.

 

Factors That Affect the Roof Replacement Timeline

Truth be told, your roof replacement can take as little as one day to as long as a few weeks. It all depends on a myriad of factors, which are:

  1. Size of Your Roof 

To put it in simple terms, the larger your roof, the longer it will take to replace it. For this reason, replacing a roof in smaller buildings takes 1-3 days, whereas larger homes may require much more.

  1. Roofing Materials You’ve Chosen 

Yes, the materials you choose will also impact the duration, as each roofing material has its own installation time.

  • Asphalt Shingles: 1-2 Days
  • Metal Roofing: 2-4 Days
  • Tile/Slate Roofing: 5–10 Days
  • Wooden Shingles: 3-4 Days
  1. Complexity of Installation

It is faster to replace the roof of a single-story home with a basic design than a complex building roof full of slopes, dormers, or valleys. Steep roofs also pose unique challenges due to the additional safety precautions that must be observed.

  1. Weather Conditions 

No matter how seasoned or skilled your roofing contractor is, they won’t be able to deliver the same turnaround in rough weather as they can in normal conditions. Rain, strong winds, or extreme temperatures can cause inordinate delays beyond the control of your contractor. Spring and summer are peak roofing seasons, while winters and pop-up storms can delay your project.

  1. Local Council Permits & Inspections 

A roof replacement is a significant alteration of an existing structure, which means you must obtain a permit from the Department of Licenses & Permits. This regulatory requirement in Philadelphia can further add days or weeks to the process.

Every Step of the Roof Replacement Process 

  • Inspection & Quote 

The process begins with your roofing contractor inspecting your existing roof. They will check for damages, recommend whether repairs will suffice or a replacement is needed, and provide an estimate. This step can be completed within 1-3 days.

  • Permits & Material Procurement 

The next order of business is to obtain the necessary permits and materials. Some roofers provide these services as an optional extra. This step is the most time-consuming, potentially needing 1-2 weeks.

  • Old Roof Tear-Off

On the scheduled day of installation, the old roofing will be removed, and necessary repairs made before new material is installed. Tearing off your old roof can be completed in 1-2 days.

  • New Roof Installation

As mentioned before, the duration of the new roof installation will depend on the roofing material. Asphalt shingles are the quickest to install, whereas slate or metal roofs require more time. New roof installations can take 1-5 days.

  • Final Inspection & Cleanup

After installation, the crew will conduct a final assessment and clean up debris, restoring your property to its original condition – only with a brand-new roof. This last step will require just a few hours.

 

How Discounted Roofing LLC Guarantees Smooth, Fast, & Precise Roof Replacements?

For each of the 30,000+ customers we have served, we have focused on fast & efficient services without sacrificing quality. Rest assured, your roof replacement will be completed as swiftly & smoothly as possible.

  • Skilled Roofers: Acquiring three decades of skills, our roofers specialize in fast & precise roof replacements.
  • Strategic Planning: From permits to materials, we will oversee & manage every aspect of your project end-to-end.
  • Advanced Equipment: Our cutting-edge tools & techniques empower us to guarantee safe  & satisfactory services.
  • Weather Monitoring: We will track forecasts to schedule installations in the ideal conditions.

 